Concrete Pipe Saddle

Anchor & guide loads from other pipes

  • The designer has more control over pipe strength than any other facet of the
  • project.
  • There is less reliance on quality installation by the installer.
  • There is lower embedment material cost.
  • There is less compaction required.
  • It is easier to maintain grade and alignment.
  • There are no excess deflection concerns.
  • There is a lower life cycle cost of the project.
  • There is a lower maintenance cost over the design life of the project.
  • There is a reduced likelihood of failure.
  • A lower risk for the specifier, designer and owner of the project, and reduced overall
  • liability to the public after the project has been commissioned.

Application

Product Code

Imperial Dim. Dia x Length (in)

Metric Dim.

Dia x Height (mm)

Weight

(kgs)

pcs/ton

Anchor & guide loads from other pipes

1-15-120-04-09

4” x 9”

100 x 225

29

34

 

1-15-120-06-09

6” x 9”

150 x 225

43

23

 

1-15-120-06-06

6” x 12”

150 x 300

68

14