Concrete Pipe Saddle
Anchor & guide loads from other pipes
- The designer has more control over pipe strength than any other facet of the
- project.
- There is less reliance on quality installation by the installer.
- There is lower embedment material cost.
- There is less compaction required.
- It is easier to maintain grade and alignment.
- There are no excess deflection concerns.
- There is a lower life cycle cost of the project.
- There is a lower maintenance cost over the design life of the project.
- There is a reduced likelihood of failure.
- A lower risk for the specifier, designer and owner of the project, and reduced overall
- liability to the public after the project has been commissioned.
Application |
Product Code |
Imperial Dim. Dia x Length (in) |
Metric Dim. Dia x Height (mm) |
Weight (kgs) |
pcs/ton |
Anchor & guide loads from other pipes |
1-15-120-04-09 |
4” x 9” |
100 x 225 |
29 |
34 |
|
1-15-120-06-09 |
6” x 9” |
150 x 225 |
43 |
23 |
|
1-15-120-06-06 |
6” x 12” |
150 x 300 |
68 |
14 |